Stabilization work at Pointe du Hoc

Travaux à la "pointe du Hoc"

Securing the bunker

Vertical metallic tubes will be implemented around the bunker. These rigid 10 inches wide and 78 feet long inclusions will be fixed into the compact layers of the cliff, in order to secure the ground under the historical monument. The path in front of the blockhaus will be rebuilt and opened after construction work is over.

Securing the bunker
Download the file (596.05 Ko)

Mentions Légales | Plan du Site | Liens utiles
Reproduction totale ou partielle strictement interdite • KitWebWan AgainDesign or DeclineValid XHTML 1.0 Transitional